Recent Planning Applications

Walker Fold The Green Low Hutton North Yorkshire YO60 7HF

14th April 2025

Internal alterations to form en-suite shower room to bedroom and external re-pointing of northern facade

The Mews House Musley Bank Malton North Yorkshire YO17 6TD

21st January 2025

Erection of a multi-purpose, agricultural building to house livestock, straw and haylage and general farm machinery

Musley Bank House Musley Bank Malton North Yorkshire YO17 6TD

22nd July 2024

Change of use of existing double garage into a one-bedroom holiday let

2 Sunny Cottages Water Lane Low Hutton Malton North Yorkshire YO60 7HG

17th October 2022

Erection of detached timber garden room and storage area for wood chips following the removal of existing dilapidated timber structure and laying of new block paving drive (revised details to withdrawn 22/00398/HOUSE dated 08.06.2022)

5 Station Cottages Water Lane Low Hutton Malton North Yorkshire YO60 7HQ

14th March 2022

Installation of 2no. dormer windows to the east elevation, erection of a replacement conservatory to the east elevation and installation of 3no. additional windows to the west elevation.

Lindrick Bungalow Musley Bank Malton North Yorkshire YO17 6TD

24th September 2021

Erection of a detached double garage

The Old Station Water Lane Low Hutton Malton YO60 7HQ

23rd July 2021

Erection of single-storey extension to south elevation, detached building to form home office and a greenhouse and installation of an air source heat pump

The Old Station Water Lane Low Hutton Malton YO60 7HQ

23rd July 2021

Erection of single-storey extension to south elevation and installation of an air source heat pump to east elevation